# Arnold, MO Concrete Contractor: Walls, Driveways and Patios Near the Meramec

> Concrete contractor in Arnold, MO: retaining walls over 2 feet need a city permit, and the city has contractor licensing rules. Plan your project here.

Canonical page: https://midwesthardscapes.com/service-area/arnold/

Midwest Hardscapes (Midwest Hardscapes, LLC) is a concrete and hardscape contractor at 4025 Old Hwy 94 S, St. Charles, MO 63304, owned by Bryan Fennell, with over 33 years of experience in concrete. St. Charles concrete and hardscape contractor serving Greater St. Louis: driveways, patios, stamped concrete, pool decks, floors, curbs, outdoor living and commercial concrete, built by craftsmen who start with what goes under the slab. BBB A+ accredited since 2023; 4.8 stars from 31 Google reviews (November 2026). Phone (636) 206-8577.

Arnold is Jefferson County's largest city, and a concrete contractor in Arnold, MO has two local facts to deal with before pouring anything: the city's permit rule for retaining walls over 2 feet, and the Meramec River. Midwest Hardscapes serves Arnold from our shop in St. Charles. This page lays out what the city says, what we do and do not know, and what we suggest you confirm with the city before you hire anyone, including us.

## Concrete Contractor in Arnold, MO: Walls, Driveways and Patios

The median Arnold home was built in 1977, and original concrete from that era was often poured without proper base compaction, which is why so many driveways and patios here have settled and cracked. The city was assembled from several older hamlets, so housing and lot types vary: some yards are flat, others need a wall to hold the grade, and some sit near the Meramec River.

Midwest Hardscapes builds retaining walls with drainage behind them, replaces driveways, and replaces failed patios on a rebuilt base. We measure a wall's exposed face before we quote, tell you honestly whether one cracked panel only needs a repair, and point out early which city rules your project is likely to touch.

## Homes From the 1970s: Repair or Replace

Arnold's history timeline names older hamlets that became part of the city, including Old Town Arnold, Flamm City and Maxville, and we do not assume anything about a lot until we have walked it. If a driveway has one cracked panel, we will tell you honestly whether repair is enough. If the whole slab has settled, replacement is usually the better path.

One Google reviewer wrote: "They even took great care around my gardens!" That is the standard we hold ourselves to on a tight lot with plantings next to the slab. For driveways, see [driveway replacement](https://midwesthardscapes.com/driveway-replacement/).

## Patios and What You Can Build Without a Wall

Many Arnold projects are flat and need no wall at all. Our [patio replacement](https://midwesthardscapes.com/concrete-patio-replacement/) work covers removing a failed patio, repairing the base, and pouring a new one with fiberglass reinforcement, which will not rust and expand inside the slab the way steel can. Patios and driveways are typically poured at a consistent 4 inches, and the right thickness depends on the use.

The city's own pages do not describe one terrain for the whole city, so we check slope, soil and rock on each site ourselves.

## Respecting the Meramec River in Arnold

The National Weather Service gauge at Arnold on the Meramec River recorded a record crest of 47.26 feet on December 31, 2015, with later high marks of 45.62 feet on May 3, 2017 and 45.3 feet on August 1, 1993. Major flood stage at the gauge is 38 feet. Arnold also has a floodplain management ordinance, Chapter 420 of its code.

That does not mean your lot floods. It does mean that if your property is near the river, you should ask the city whether floodplain rules touch your project before a patio or wall is designed. Concrete handles weight well but it does not care for standing water under it, so grading and base matter more here than in a dry upland yard.

## Retaining Walls Over 2 Feet Need an Arnold Permit

The city's building permits page says: if the exposed face of a wall is over 2 feet in height, a permit is required. That is stricter than the 3 foot threshold St. Louis County uses for its unincorporated areas, so advice you hear about a neighboring community may not apply here.

Measure the exposed face, the part you can see, not the depth of the footing. If your wall is near 2 feet, treat it as a permit job and ask the city. Our [retaining walls](https://midwesthardscapes.com/retaining-walls/) page explains how we build them: drainage behind the wall matters as much as the stone in front of it.

For a concrete contractor in Arnold, MO who tells you what to confirm with the city before work starts, call (636) 206-8577 or ask for a free estimate. Bryan or the crew lead assesses the site, we send a written proposal, and you can get other quotes too.

## Services

- [Retaining Walls St. Louis | Block, Stone, Boulder](https://midwesthardscapes.com/retaining-walls.md)
- [Driveway Replacement in St. Charles & St. Louis, MO](https://midwesthardscapes.com/driveway-replacement.md)
- [Concrete Patio Replacement St. Charles | Midwest Hardscapes](https://midwesthardscapes.com/concrete-patio-replacement.md)

## Local resources

- Arnold Building Permits and Inspections: https://www.arnoldmo.org/government/departments/community-development/building/building-permits-inspections/
- Arnold History Timeline: https://www.arnoldmo.org/arnold-history-timeline/

## Frequently asked questions

### Do I need a permit for a retaining wall in Arnold?

If the exposed face of the wall is over 2 feet tall, yes. That is from the city's building permits page. The rule is stricter than St. Louis County's 3 foot threshold. If your wall is close to 2 feet, ask the city before you plan the project.

### Can any contractor work in Arnold?

The city's building permits page says only contractors holding a city license may do work in Arnold. We are not going to tell you from here how that applies to a particular job, and we do not claim an Arnold license on this page. What we suggest: call Arnold's building permits office, ask what a contractor needs on file for your scope, and check that whoever you hire meets it. Then ask us what we need to know. Honest answers now save a stalled permit later.

### How far ahead should I apply for an Arnold permit?

The city asks that permit applications be submitted at least two weeks before the start date, so the order of events matters. Check the city's license requirements first, then settle the design, then submit the application, then schedule the crew. Booking a pour date before the permit is in hand invites a delay that is not anyone's fault but is still yours to live with. We send a written proposal after the walkthrough, and you can use it for the application and for comparing quotes.

### Is Arnold's flooding a concern for concrete?

It can be, near the river. The Meramec at Arnold hit a record 47.26 feet on December 31, 2015, and the city has a floodplain ordinance. If your lot is close to the river, ask the city whether floodplain rules touch your project, and we will plan grade and base with that in mind.

### Should I repair my driveway or replace it?

It depends on what is under it. If damage is limited, repair can make sense, and we will say so. If panels have settled because the base was never compacted, replacement fixes the cause. We assess at the walkthrough and tell you which one fits.

### How long until I can drive on a new driveway?

Plan on at least one week. Concrete reaches its design strength around 28 days, and installs often take 2 to 3 days of work depending on size. We tell you what to keep off the slab and when, so you are not guessing. Weather and the base inspection, if the city asks for one, can shift the pour date.

### What do you measure before quoting a retaining wall in Arnold?

Because Arnold's permit rule turns on the exposed face, we first measure that face at its tallest point and mark where the grade changes. Then we look at what sits above the wall: a driveway, a patio, a play set or just lawn, since a load above the wall changes how it should be built. We also trace where the water comes from and where it leaves. Soaked soil pushes harder than soil that drains, so a wall without drainage behind it is a wall waiting to fail. If a wall will be near 2 feet, we tell you so you can ask the city first.

## Contact

- Midwest Hardscapes, 4025 Old Hwy 94 S, St. Charles, MO 63304
- Phone: (636) 206-8577
- Free estimate: https://midwesthardscapes.com/contact-us/
